If you're not following my Facebook or Instagram accounts, you may not know that I finished the bathroom floor on Friday night. Let's have some pictures, shall we?
I wanted to go to Chicago on Saturday, so I put my hours in during the evenings. Of course, it's easier to be more motivated when you're on the way to finishing something!
The bathroom flooring had to be done so the vanity and toilet could be put in. So, "tag, you're it" Troy!! :)
Troy has been working on putting in the plumbing for the shower:
and he put in the tub surround:
Still more work to do on it, but the tub looks more finished and the surround pieces are out of the way where they were being stored. I love getting things out of the way!!
The process of converting a lovely old farmhouse into an efficient cheap-to-heat comfortable home and the life we lead while doing it.
Showing posts with label hardwood flooring. Show all posts
Showing posts with label hardwood flooring. Show all posts
Sunday, April 09, 2017
Monday, April 03, 2017
Not Burying the Headline
Let's start with first things first: I started putting flooring down this week:
This is the first flooring we've put down in this house. I am so excited about it.
Part of why I could get to it is because Troy finished the subfloor:
I didn't know he had more plywood in the shop. Much like the person who hides a puzzle piece and gleeful puts in the last piece, Troy filled in the last two gaps in our subfloor. Not that I minded.
He also framed the linen closet:
Can you make that out? Here it is from the back:
Easier to see?
Deciding there was nothing in the way of doing the flooring in the bathroom, I cleared the room and vacuumed on Friday night:
Saturday I rewatched the youtube video about putting down flooring and got to it:
As I told Troy before he left for the day--anything I did wrong couldn't take more than a week to undo!
This is the first flooring we've put down in this house. I am so excited about it.
Part of why I could get to it is because Troy finished the subfloor:
I didn't know he had more plywood in the shop. Much like the person who hides a puzzle piece and gleeful puts in the last piece, Troy filled in the last two gaps in our subfloor. Not that I minded.
He also framed the linen closet:
Can you make that out? Here it is from the back:
Easier to see?
Deciding there was nothing in the way of doing the flooring in the bathroom, I cleared the room and vacuumed on Friday night:
Saturday I rewatched the youtube video about putting down flooring and got to it:
As I told Troy before he left for the day--anything I did wrong couldn't take more than a week to undo!
posted
4/03/2017 05:01:00 PM
Filed under:
1401,
flooring,
hardwood flooring,
master bedroom,
subfloor
Subscribe to:
Posts (Atom)