Wednesday, May 08, 2019

If you wait long enough, even slow progress adds up

If this were a movie, the following would be a time lapse montage with inspiring music playing. (Got that scene set in your head?) Ok,

January 2018
The vanity wall has been redone and drywalled. (Reread this post for reminder of disaster.)

After that comes primer:
The bathroom and closet would have been done (primed) at this point.

March 2018
The vanity is installed (pictures coming below) and I put inserts in the back of the medicine cabinets. I covered them with wall paper. Nothing is permanently attached so it would be easy to change. Shortly after this Troy installed the shelves and that's what holds the insert in.

By April I had the bathroom and closet painted. It's a warm light tan colour (Valspar 3005-10B Gardenia if you're really curious. Depending on your screen settings, the picture in the link may or may not look like my wall.).
We had had water flowing since the previous November (2017). That was a very very happy day.
Troy installed the purchased mirrors with piano hinges to be the door of the medicine cabinets:

Moving on to the bedroom. The drywall went up at the same time as the bath and closet and I think was roughly done at the same time. Getting the bathroom done being our first priority, the bedroom lagged behind.

We got in a slog (cue the ominous music for our montage) about mudding and sanding, and it was not done for a long time.
A really long time. Meanwhile, Troy did get some doors installed in February of this year. I think it was just in time for the superbowl when we had some people over.
The bathroom and closet doors are in; the main bedroom door is not.

This happened at some point along the way:
A few months after we started using the shower, we noticed water in the office below. Troy really didn't think it was his plumbing (I mean, really! As if!) but he opened the wall anyway to confirm that yes, indeed, his plumbing was not leaking.

After more investigation, he saw that the caulk had failed and the water was seeping out where the shower wall met the tub. This shower/tub unit advertised that you didn't need caulk in large letters. Troy would have caulked anyway, but further in the instructions the instructions said that if you didn't use caulk, the unit may leak. What? I think they advertised you didn't need caulk because the walls are made of a material that caulk really doesn't want to stick to.

Troy super redid the caulk and we haven't had any trouble since. And we have a hole in the wall.

We decided to cover the hole with a mirror. A mirror we could remove later if needed. In other words an access panel.
The mirror is in a great spot at the end of the little hall between the closet and the bath. Troy did a great job finding matching trim and then detailing it to match the vanity mirrors.
The  mirror is hanging from a French cleat and is completely flush to the wall because the cleat is attached to the studs, which are recessed from the drywall. It really is slick. The other thing that tickles me about it is that we used a mirror we already had. It was large enough to cover the hole and the frame Troy built covered damaged parts of the mirror so it looks almost new. And cost us $0.

I think some time in May we declared the drywall done or we would have been doing it the rest of our lives. And I set to priming
and then painting. The walls are a light grey that looks purple, but mostly in daylight. Since I'm mostly in my room at night with the light on, maybe it will always look grey for me. :) (Valspar 4001-1B Winter Calm if you're curious.)
I also got the doors painted. Dark greyish brown (DutchBoy 447-7DB Velvety Night)
We went with silver coloured lever type handles and got enough for all the doors upstairs.
A current shot of the bathroom, where you can see the curtains I finally found and bought:
I would say I've looked long and hard and in the end I found them at Menard's, where we buy everything else for the renos. But only because I gave up on having linen.

The only wall decoration I've hung:
I found this cheeky cheetah and zebra pair at Goodwill a few years ago. No, please don't think I have a jungle theme going on! But they're snappy and match the brown/grey or gold/silver thing I've got going on in these rooms.

We're getting close enough to moving into the bedroom that I got serious about shopping for furniture. I wanted a narrower tall dresser for myself so it could sit right in the closet. (In fact, I'll be building the closet shelving/rods around it.) I found this curved beauty at one of the antique "malls" near here.
If you look closely at a picture further up (in the closet behind the partly open door), you can see the curved-drawer secretary that I just bought for my nightstand. They're not a set but they've got the same look and style.

And then at Goodwill, I found a pair of these chairs:
I love the little wing arms and they feel good to sit in. Yes, I'm a little leery of used upholstered furniture, but I really like these and they looked pretty good. They had zero smell as I drove home with two of them stuffed in my car so I take that as a good sign.

I was thinking I was going to reupholster them but Troy liked the existing fabric and since it matches my grey/brown theme, I'm going with it. I'm hoping one chair will fit in the closet (a place to sit to put your socks on) and the other can be in the bedroom. Otherwise I'll find room for them both in the bedroom. In case you're wondering, $10 each. I was going to paint the legs to match the doors but I don't have enough paint. Buy more now or wait until I'm painting the main bedroom door?

Currently, I am up to my eyeballs in trim, getting it painted and ready for Troy to install.
A priority since the baseboard needs to go in the closet before we finish up the storage part of it. I am dying to get my clothes in there.

Saturday, April 22, 2017

One Setback Leads to Another

It has not been a productive week, construction wise.

Troy and I moved the vanity into the bathroom so he could continue on the plumbing. What should have been a triumphant milestone moment quickly moved to confusion, then continued to disbelief and landed at resignation.

The medicine cabinets, sockets and light boxes that Troy carefully centered over the vanity didn't actually center over the vanity. It was off by only about 3 inches, but that's enough. And adjusting all of it 3 inches is just as much work as adjusting it 12 or 20 inches, but it hurts more.

On top of that, there wasn't enough room for where the toilet was supposed to go. After many minutes, we decided the vanity would moved into the far corner (against the east wall) and the toilet would go on the other side:
At least we have a good solution, but this means Troy will be redoing the entire wall behind the vanity. But that was going to happen as soon as we saw that the vanity wouldn't center. At least we found a solution that will work.
So Troy will need to redo that wall. It took a week the first time so he is figuring on that much time again. But maybe it will go quicker the second time.

And as soon as we moved the vanity, I knew I would have a problem in the floor that I will have to fix. See that big gap behind the toilet?
When I realized that was going to happen (my error), I thought long and hard about fixing it at the time. But it was going to be under the vanity and just how  much of a perfectionist was I going to be? Well, now it's not under the vanity but visible behind the toilet. Not a view I get a lot, but Troy will be looking at it every day. :) So I will be working on ripping out a row or two of flooring and redoing it. Is this what they mean by "misery loves company"?

The box with the vanity top was open so I snapped a picture.
I don't think I've shown it before. It's a dark brown. The undermount sinks are porcelain. It's not my favourite (I think I've mentioned that I wanted square sinks and would have liked a different finish) but even I have to limit how far I can apply my reasoning that if we're doing the work ourselves, we can buy more expensive supplies. In this case the limit was twice the price. (Although, to be honest, if Troy was less reluctant, I probably could have applied my logic to this case too!)

But don't worry...when I'm using those sinks in the bathroom right next to my bedroom, I will not be bemoaning the vanity top. I will be so happy to have plumbing. Upstairs and next to my bedroom!

Sunday, April 09, 2017

Bathroom Floor (and other things that are not as exciting as the bathroom floor)

If you're not following my Facebook or Instagram accounts, you may not know that I finished the bathroom floor on Friday night. Let's have some pictures, shall we?


I wanted to go to Chicago on Saturday, so I put my hours in during the evenings. Of course, it's easier to be more motivated when you're on the way to finishing something!

The bathroom flooring had to be done so the vanity and toilet could be put in. So, "tag, you're it" Troy!! :)

Troy has been working on putting in the plumbing for the shower:
 and he put in the tub surround:
Still more work to do on it, but the tub looks more finished and the surround pieces are out of the way where they were being stored. I love getting things out of the way!!

Thursday, February 02, 2017

Building Walls

We have continued our work and shopping sprees. We made a decision on the flooring - bamboo with a light finish. They didn't have enough in stock so it is on order.

The next week we went in to look at counter tops and ended up ordering one. It came with only one option of sink so there was no decision to be made there. (Very disappointingly, it did not have the option of a square sink, which I adore.)

But miraculously, we did manage to choose lights for above the vanity mirrors. That went a lot easier than I thought it was going to. (And can I say, there are some crazy lights available right now. Like I think they might be too shiny and tacky for a night club. Seriously.)

The counter had to be ordered and they didn't have two lights in stock so we had to order the second one. Those items are scheduled to be in tomorrow. The flooring isn't estimated to be done until the end of the month.

Meanwhile Troy picked up the vanity, linen closet and mirrors and we wrestled them into the house. we unpacked them right away to check for damage and found this:
The front top corner had quite a ding on it. It is going to be under the counter top but it's the corner that you see right when you walk into the room. :(

We decided it wasn't worth packing up the vanity and trying to bring it back so the following day when we were in the store, we showed the pictures to the customer service people and asked if they could give a credit for the damage. They did and we were happy! And of course we turned around and spent it at the store right away!

Troy has been adding the walls which will define the bathroom space. First the third side of the tub/shower:
The green drywall is treated to prevent mildew from developing.
Troy has an additional trick of coating the dry wall with varnish. That will keep the moisture out!

And just this week, he added the main wall dividing the bathroom from the closet. This is the view from the closet side:
and here is a view from the bathroom side:
That is the wall where the plumbing for the sinks will go as the vanity will be up against it.

The big hole in the middle that looks like it's going to be a pass-through window is not. That is the space for the medicine cabinets. Troy will be building the boxes in the wall and then hinging the mirrors on the front.

Meanwhile, I have kept busy in the bedroom. I finished the ribs to level the floor (yay!) and have put in piece 3 and 4 of the subfloor.
I couldn't get piece 5 (on the left) to go in so Troy worked on it and it is now ready to be screwed down. The rest of the pieces will have to be cut to fit so they will take a little more care. Nothing complicated though.

Now that the bedroom is empty I have had a chance to get a better look at the drywall. Sadly, it doesn't look like much of the sanding has been done at all--certainly a lot less than I had thought. I am not looking forward to that.

Saturday, January 21, 2017

Shopping and Subfloors

I'm on a roll now...posting two weeks in a row!

Let's see what 16 hours can get us. Well, really 15 because I have an hour still to do for this week. Don't look at me like that--I still have time!

First, we did a lot of shopping last week. I told you we were going to look for a faucet for the shower and tub and we found one. No, it didn't knock my socks off but good enough is good enough.
Delta-Dawson model
I did get the "waterfall" tub faucet which I like and didn't think we would ever get. (Don't ask me why. I think I just assumed Troy wouldn't like it or there would be some plumbing reason it wouldn't be as good.) Anyway, one decision down.

Since we were there we thought we should look at the matching sink faucets. They had a couple styles in the same series which we didn't like, but we found another one from the same company. We bought three--two for the master bath which will have a double vanity and one for the bathroom downstairs where the sink faucet's drip had become a solid stream of water.
Delta Porter model
One handle control was a must for me and I think the styles are simple enough that there aren't a lot of ridges or valleys to make it hard to clean. #fingerscrossed

While Troy was picking out plumbing parts to fix the downstairs sink (he knew it was bad enough that the shut off valve was going to break when he started working on it...and it did!), I wandered over to vanities and sinks to amuse myself.

When Troy joined me, I had this one to show him:
Avanity Brentwood collection
We both liked it a lot but we didn't want something with legs (and yes, we did talk about ways we could alter that) and it wasn't in the store to see and touch. That was a big drawback.

Long story short, we ordered this one:
Magick Woods Wallace collection
(We still have to pick out a countertop and sinks.)

We both really liked this linen cabinet:
Magick Woods Bellemont collection
and bought it. It had a very nice matching vanity with the same rounded front but it didn't come in the larger sizes. I know the finish colours of the two pieces don't look like they match in the pictures, but they were right beside each other in the store and Troy and I both thought they looked good together.

Fortunately I liked the mirrors that matched the linen closet:
because I really did not like the ones that matched the vanity.

So that was a bit more than we went in for but what a relief to have those decisions made. (Tomorrow we're going to look at flooring options. Who knows how much stuff we'll end up buying!)

Meanwhile in the rest of the week, Troy installed the first of the plumbing to the tub (the drain and overflow pipe), framed the wall that needs to be installed at the end of the tub and started to plan for how he was going to frame the linen closet.

I continued on the ribs for leveling the floor.
We are making our way to the other side of the room, slowly hemming in the tools and whatnots. Between doing the floor and Troy framing walls inside the bathroom,
it feels like we do a lot of shuffling stuff around!

Today I had the satisfaction of installing the second piece of subfloor in the bedroom.
It is cut, fitted and all screwed down. It is a marvel how much nicer it is to walk on! Level, flat, and solid.

Saturday, January 14, 2017

8 hours. For What?

Oh tell me what I got?

If you're a child of the 80s, you now have a song running through your head. #sorrynotsorry

What does this have to do with our house? Having noticed that we didn't made any progress on the house in the last year, we determined to make lots of progress now. One thing we are doing is making sure we each work 8 hours on the house each week.

What has been done recently?

Troy is working on putting in the tub. Here he is dry fitting the parts.
Tomorrow we are shopping for faucets. I have tried to find one I like and have not been able to. This week I found one online that I liked well enough but it is a little pricey and has to use an expensive valve that doesn't come in an option for PVC pipe. We'll see what we find tomorrow. If I still don't like anything, then I will apply my theory that if we're doing all the work ourselves, we can afford to spend more on materials if that's what it takes or what we like.

Troy has gotten the bedroom set up for leveling the floor and I have been working on installing the ribs.
This afternoon I finished all the ones needed for the first course of plywood and I couldn't resist throwing down the first piece of subflooring. It's not fastened yet (or even cut to shape) but it made me feel like progress was being made and it's so much nicer to walk on than those ribs.
Troy has also hooked up power to all the lights and installed temperary fixtures so we can now see what we're doing in the evenings. That will help keep progress moving too. :)

I added an outlet in the seasonal closet (you can actually see it in the bottom left of the picture above). It was missed in the original plan. Fortunately the walls were open long enough that I realized the oversight. (Silver linings.)

While the bathroom needs a lot of work (all new plumbing, a couple more walls built, etc), it struck me how little there is to finishing the bedroom--finish subfloor, put up a few more bits of drywall and finish mudding/sanding, paint, put in flooring. We could then trim the windows, but that's about it, right? It's amazing to think that I could do all of that while Troy is plumbing and building the bathroom.

Writing blog posts doesn't count for my 8 hours :( but I'll try to keep you updated on how things are going now that I have things to write about.