Wednesday, October 29, 2008

The Inspection that Wasn't...or Was?

Troy called Inspector BS on Monday to arrange an inspection of the framing. BS said ok he could do it the next morning, but could Troy please call him to remind him. [The next morning...to remind him that they had talked yesterday for an inspection today.]

So Tuesday morning Troy calls BS to remind him of the inspection they had arranged yesterday and BS says, oh yes I came by yesterday and snooped around while you weren't home. (Ok, ok, so Inspector BS probably didn't use the word snoop.) He made no comment on the framing except to say that Troy had to have the roof done (sheathed and shingled) before he could do the framing inspection. So all this time we had been waiting to start the shingling, we could have actually been shingling. (You know, me shingling while Troy was finishing up the framing piddling things.)

AND Inspector BS verifies with Troy that he's going to also add a moisture barrier* over the part of the roof that overhangs the eaves. Troy replies, you know I am going to be adding R-50 insulation and there will be no need for that, right? BS says, oh yes that is true but the code says it needs to be there. Besides I couldn't get a variance when I built my own house so I am not going to give you a variance. [I will insert here, na-na-na-na-boo-boo, but I'm sure BS didn't really say that either.]

So we will commence with roofing including the moisture barrier with two thoughts in our minds:
1. We are basically approved because if Inspector BS had seen something wrong when he was around Monday he would have said something; and
2. Inspector BS saw that the roof was not done and stopped the inspection there only to wait til the roof is done to tell us what else we need to fix.
(Ok, really there is one more option: 3. Inspector BS basically approved it but when he comes back to see the roof he will decide he doesn't like something that he thought was ok the previous time.)

Wish us luck and just a touch warmer weather!
-christina

Footnotes:
*Moisture barrier, you ask? This is for houses with insufficient insulation in the attic. This causes the attic to heat which causes the snow on the roof to melt. The melted snow runs down the roof and reaches the part of the roof over the eaves which is not heated and then freezes into ice and oh-so-picturesque-on-someone-else's-house icicles. This can cause an ice dam and then the melted snow can back up under the shingles and ruin your roof. The moisture barrier is used to try and protect the plywood from the damaging moisture. Of course, if your house is insulated, your attic is cold and then you have no need for this barrier, thank you very much, Inspector BS.

Thursday, October 02, 2008

Catching Up

Been wondering what we've been up to? I can tell you Troy's been busy with plywood. The south side of the roof is done except for the final pieces along the east side. He still has to add the overhang for the eave on that side and he can't do the plywood until that is done.
Troy did cut off the plywood on the west side over the eave so that side is looking very finished now.
I don't know if this picture will convey the feeling I had the other day, but I was walking to the compost pile and glanced over to the shop and thought, "Wow! That looks like a room now." I guess it was the trusses making a ceiling, even if an incomplete ceiling.
Troy has also made the frame for both windows in the shop. There will be one on each of the north and south walls.

As for other little projects around the house, the upstairs sink is now working again. (Super YEAH! Especially since we are expecting company soon.) And while we were having the super deluge of rain a couple weekends ago, I mentioned to Troy that it would be really nice if he could find the time to fix our chimney since rain was falling into it and making our stove and pipes rust inside. Not nice. (You may recall that the chimney topper and top section of pipe were ripped off in a big wind storm last winter.) Troy found time in short 
order, and the chimney is now working splendidly.

I tested it today with a nice roasty fire. The air is getting
 chilly, that is for sure; this is the second fire for us for this season. (The first one I insisted Troy make for me after helping him outside on a cold drizzly day.) Currently I am absolutely cooking in the living room, even with all the fans running. As soon as this is done, I will seek cover in another room.

I think this is all for now. I tried to do shingles today, telling Troy I had a whole day free to offer him. But (alas) the work must be inspected before we can continue to shingles. So I was off the hook. (I'll try not to "yippee!" too loud.) Troy said he needed to finish the plywood on the roof (including the east eave and leveling the east gable) and then it's inspection time. Let's hope nice (but still crazy) Inspector shows up instead of his other personality, evil and crazy.

Take care of you and the ones you love,
christina