In any case, we continue to take steps to getting the kitchen done. Troy is this far on the floor joists and insulation:
Less than half way. The third one is lower because that is where the plumbing for the sink will go.
One thing that I helped with last weekend was putting one-inch foam in the bays of the outside walls.
Troy doesn't want the cellulose insulation sitting directly on the concrete floors because IF the concrete ever gets wet it will transfer to the cellulose and do bad things. With the foam insulation, the dampness won't be able to get to the insulation.
I did a very good job, I must say! ;-)
A final "big picture" view: